【24h】

AUSTRALIAN RRRP FIRST SHUTDOWN SYSTEM SEISMICQUALIFICATION

机译:澳大利亚RRP首次关机系统地震鉴定

获取原文
获取外文期刊封面目录资料

摘要

This paper presents the seismic qualification methodology used for the First Shutdown System of theAustralian Replacement Research Reactor. The seismic qualification was carried out by means of analysis andtesting. The analysis was developed in a first step in order to compute stresses and displacements on themechanisms. In a second step testing was adopted as qualification method with the development of anexperimental setup. The test objective was to demonstrate the effectiveness of the shutdown system under theseismic action imposed by the most demanding seismic event condition used for the design of the reactor. The keyparameter measured during the test was the control plate insertion time, which is the relevant parameter from thenuclear safety standpoint. The seismic analysis showed that no undue stresses or displacements will be present onthe mechanisms for the most demanding seismic condition. Consistently, the test results were that the system isable to insert the control plates within the required time. It was observed that there is no noticeable difference onthe control plate insertion times for the cases with or without the presence of the seismic action.
机译:本文介绍了地震检修系统的地震鉴定方法。 澳大利亚替代研究堆。地震鉴定是通过分析和 测试。分析的第一步是为了计算应力和位移。 机制。在第二步中,随着 实验装置。该测试的目的是证明在以下情况下关机系统的有效性: 反应堆设计中最苛刻的地震事件条件所施加的地震作用。钥匙 在测试过程中测得的参数是控制板插入时间,它是来自控制板的相关参数 核安全立场。地震分析表明,在地面上不会出现不适当的应力或位移。 最苛刻的地震条件的机制。一致地,测试结果是系统是 能够在要求的时间内插入控制板。据观察,在 在有或没有地震作用的情况下,控制板的插入时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号