首页> 外文会议>SPE/IADC drilling conference >The Planning and Drilling of Hot Ice #1 - Gas Hydrate Exploration Well in the AlaskanArctic
【24h】

The Planning and Drilling of Hot Ice #1 - Gas Hydrate Exploration Well in the AlaskanArctic

机译:热冰#1的规划和钻探-阿拉斯加北极的天然气水合物勘探井

获取原文

摘要

Anadarko Petroleum entered into a cooperative effort in 2002with the U.S. Department of Energy (DOE) and MaurerTechnology Inc., a subsidiary of Noble Drilling, to explore forand production test a Gas Hydrate zone. The purpose of theproject was to build on previous and ongoing R&D in the areaof onshore hydrate deposits to identify, quantify and predictthe production potential for hydrates. The plans included thecontinuous coring and then production testing of a GasHydrate well on the North Slope.The project scope was modified to include the field trial ofan onshore Mobile Platform that Anadarko had designed(patent applied for), presented by Kadaster and Millheim1 atthe 2004 annual IADC/SPE meeting in Dallas, Texas.With this scope modification, the project also became aprototype project for a cost effective and environmentallysafer exploration system in the remote reaches of the Arcticand other environmentally sensitive areas, such as the USRockies or the shallow water estuaries around the world.While the geological and geophysical analysis were beingconducted; the drilling / coring systems and the drilling rigwere selected; the modular platform systems commissioned;the drilling and platform sub-systems tested in simulated andactual arctic conditions, and the potential wellsites permitted.Field operations commenced in January 2003, suspendedin April 2003, resumed in January 2004 and completed inMarch 2004. The entire Hydrates Stability Zone was coredand analyzed. Although no hydrates were encountered,valuable information and field expertise regarding the hydrateexploration methods, the modular Arctic Platform and theprototype remote exploration systems were gained.
机译:阿纳达科石油公司于2002年开始合作 与美国能源部(DOE)和莫拉尔 Noble Drilling的子公司Technology Technology .. 并在天然气水合物区进行生产测试。目的 该项目是建立在该地区先前和正在进行的研发基础之上的 陆上水合物沉积物的识别,量化和预测 水合物的生产潜力。该计划包括 连续取芯,然后进行天然气生产测试 在北坡水合良好。 项目范围已修改为包括以下项目的现场试验 阿纳达科设计的陆上移动平台 (已申请专利),由Kadaster和Millheim1在 在德克萨斯州达拉斯举行的IADC / SPE 2004年度会议上。 通过此范围的修改,该项目也成为了 具有成本效益和环保的原型项目 北极边远地区更安全的勘探系统 以及其他对环境敏感的地区,例如美国 世界各地的落基山脉或浅水河口。 在进行地质和地球物理分析时 实施;钻孔/取芯系统和钻机 被选中;调试的模块化平台系统; 在模拟和测试中测试的钻井和平台子系统 实际的北极条件,以及允许的潜在井场。 实地行动于2003年1月开始,已暂停 于2003年4月恢复,于2004年1月恢复,并于 2004年3月。整个水合物稳定区都进行了核心工程 并进行分析。尽管没有遇到水合物, 有关水合物的宝贵信息和现场专业知识 探索方法,模块化北极平台和 获得了原型远程勘探系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号