首页> 外文会议>SPE/ICoTA coiled tubing conference exhibition >A Novel Method Using Coiled Tubing for Dewatering Gas Wells
【24h】

A Novel Method Using Coiled Tubing for Dewatering Gas Wells

机译:连续油管脱水气井的新方法

获取原文

摘要

This paper will present an entirely new process for de-wateringgas wells with liquid loading problems. The process removesproduced liquids via a separate flow path and allows gasproduction unhindered by any liquid head. The result is highergas production rates arising from increased draw-down and areduction of near well-bore liquid saturation. An importantadditional benefit is ability to produce these wells atsignificantly lower flowing bottomhole pressures, resulting inan increase in recoverable reserves.
机译:本文将介绍一个全新的脱水过程 液体装载问题的气井。该过程删除 通过单独的流路产生液体,并允许气体 生产不受任何液头的阻碍。结果更高 提款量增加和天然气产量增加而产生的天然气生产率 降低近井眼的液体饱和度。一个重要的 额外的好处是能够在以下位置生产这些井 显着降低了井底流动压力,从而导致 可采储量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号