The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The successes were largely dependent on the accurate subsidence predictions, correct assessments of potential influences, appropriate design and implementation of the mitigation measures. However, such efforts for protecting large industrial structures are still very rare In this paper, the successful assessment and mitigation of the subsidence influences associated with a very intensive dynamic longwall subsidence process on a large workshop are presented.
展开▼