首页> 外文会议>International Conference on Ground Control in Mining >Development of a New Roof Bolt Technology to Improve Gate-road Performance
【24h】

Development of a New Roof Bolt Technology to Improve Gate-road Performance

机译:开发新的屋面螺栓技术以提高闸道性能

获取原文

摘要

The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy operation. It also replaces 4 items (drill head and steel, adhesive cartridge and anchor) for simplified material management. This paper describes its history of development, and bolt, bolt drilling and bolt resin specifications, experimental test results in Germany where it achieved a reduction of 36-42% in roof bolt cycle time and 25-30% improvement in gateroad development rate. In the U.S. coal mines, a time study showed that OneStep can save approximately 50 seconds in installation time per bolt.
机译:新开发的Hilti OneStep屋顶螺栓将标准的5步锚固过程(即钻孔,钻钢转移,树脂插入,杆插入和拧紧)结合在一起,操作简单易行。它还替换了4个项目(钻头和钢,胶粘剂盒和锚固件),以简化材料管理。本文介绍了它的发展历史,螺栓,螺栓钻孔和螺栓树脂规格,以及在德国的实验测试结果,该方法使屋顶螺栓的循环时间减少了36-42%,闸道的开发速度提高了25-30%。在美国的煤矿中,一项时间研究显示,OneStep可以节省每个螺栓约50秒的安装时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号