首页> 外文会议>Electricity Distribution, 2005. CIRED 2005 >Pilot installation of GTACSR conductors in the Spanish power system
【24h】

Pilot installation of GTACSR conductors in the Spanish power system

机译:在西班牙电力系统中试行安装GTACSR导线

获取原文

摘要

The significant increase in power demand, with the resulting saturation of electrical transmission and distribution lines, has made Iberdrola to review its strategy to increase the ampacity of existing lines. Traditionally, line upgrading techniques have been applied (change from single conductor to twin bundle, increase in conductor cross section, increase in voltage level or the use of double circuits).
机译:电力需求的显着增加,以及随之而来的输电和配电线路的饱和,使Iberdrola对其增加现有线路载流量的策略进行了评估。传统上,已经应用了线路升级技术(从单导体更改为双束,增加导体横截面,提高电压水平或使用双回路)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号