首页> 外文会议>Electricity Distribution, 2005. CIRED 2005 >Implementation of a new SCADA/EMS/DMS in a large utility, integrated with corporate information systems
【24h】

Implementation of a new SCADA/EMS/DMS in a large utility, integrated with corporate information systems

机译:在大型公用事业中实施新的SCADA / EMS / DMS,并与公司信息系统集成

获取原文

摘要

This paper reports the control centres renewal project, that Iberdrola Distribution has undertaken with the company Siemens. Three out of six systems are already in operation and the rest are scheduled for 2005. Project highlights are: the concentration of systems carried out, the unified operator's interface, the renewal of the communications in the field, the advance functionality introduced for the first time in Iberdrola such as electrical applications for medium voltage and the connection to the corporate systems, both for static data -network models, graphics- and for dynamic data such as electrical magnitudes and information related to quality of service.
机译:本文报告了Iberdrola Distribution与西门子公司合作进行的控制中心更新项目。六分之三的系统已经投入运行,其余的定于2005年投入使用。项目重点是:集中的系统,统一的操作员界面,现场通讯的更新,首次引入的高级功能在Iberdrola中,例如用于中压的电气应用以及与公司系统的连接,包括静态数据-网络模型,图形-和动态数据,例如电气强度和与服务质量相关的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号