首页> 外文会议>Electricity Distribution, 2005. CIRED 2005 >Limitations in the application of on-line and off-line PD measurement systems
【24h】

Limitations in the application of on-line and off-line PD measurement systems

机译:在线和离线PD测量系统的应用限制

获取原文

摘要

The first underground cables to be installed in the UK were paper-insulated cables and their installation dates back as early as the 1920's. Although the manufacturing technology was primitive compared to that available today, there are still 50–60 year old cables that remain in working condition. In the modern power system, these cables are both an asset and a liability. Failure can lead to interruptions in supply and customer minutes lost, indices used by the regulator to reward distribution network operators. Companies are therefore under pressure to somehow improve the performance of cable assets. However, the economic costs relating to the replacement of all cable assets at the end of their life are prohibitive and strategies to determine the relative health of cable assets are becoming increasingly important.
机译:英国最早安装的地下电缆是纸绝缘电缆,其安装最早可追溯到1920年代。尽管与现在的制造技术相比,制造技术是原始的,但仍有50至60年的电缆仍处于工作状态。在现代电力系统中,这些电缆既是资产又是负债。故障可能导致供应中断和客户损失的时间,监管机构使用该指数来奖励分销网络运营商。因此,公司承受着以某种方式改善电缆资产性能的压力。但是,与在使用寿命结束时更换所有电缆资产相关的经济成本令人望而却步,并且确定电缆资产相对健康状况的策略变得越来越重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号