THE ATLANTA WEST AREA CSO STORAGE TUNNEL AND PUMPING STATION PROJECT—15 MONTHS OF DESIGN ACCOMPLISHED WITHIN 10 MONTHS

机译:亚特兰大西部地区CSO储存隧道和泵站项目-在10个月内完成15个月的设计

获取原文

摘要

Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day) submersible pumping station and associated facilities were accomplished ahead of a federal court mandated consent decree schedule. Challenges overcome by the project team in enabling timely completion of the construction documents will be presented. Discussion includes evolution of final design, consideration of future O&M requirements, and risks identified for construction and operations, together with measures to manage and proactively prepare for such risks.
机译:在极其激进的时间表下,最终设计完成了13.5公里(8.4英里)英里,直径8.2 m(27英尺)的深部岩石隧道,322 ML /天(8500万加仑/天)的潜水泵站和相关设施的提前设计工作。联邦法院授权的同意法令时间表。将提出项目团队在及时完成施工文件方面克服的挑战。讨论内容包括最终设计的演变,对未来运维要求的考虑以及为施工和运营确定的风险,以及管理和积极准备此类风险的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号