首页> 外文会议>Rapid Excavation and Tunneling Conference >PARBATI HYDROELECTRIC PROJECT STAGE II, INDIA-TWO INCLINED PRESSURE SHAFTS WITH A HONEYCOMB SEGMENTAL LINING DRIVEN BY A 5M HARD ROCK DOUBLE SHIELD TBM
【24h】

PARBATI HYDROELECTRIC PROJECT STAGE II, INDIA-TWO INCLINED PRESSURE SHAFTS WITH A HONEYCOMB SEGMENTAL LINING DRIVEN BY A 5M HARD ROCK DOUBLE SHIELD TBM

机译:PARBATI水电站项目II,由5M硬岩双屏蔽TBM驱动的蜂窝状分段衬砌的印度-两个倾斜压力井

获取原文

摘要

India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in 2001 to take execution of the 800 MW Stage-II of the prestigious 2,051 MW Parbati hydrolelectric project in Kulu district of the northern province Himachal Pradesh. Two parallel 30° inclined underground pressure shafts of 1.542m in length each will be excavated in different geological formations and lined with hexagonal concrete segments by a hard rock double shield TBM. That kind of heading will be a novelty to India and an innovative method for inclined pressure shafts. The 4.88m Mitsubishi DS TBM will be assembled underground on a swivelling steel platform especially designed for the launching as well as for the acceptance of the TBM in the upper cavern of each shaft. The hexagonal segmental lining system causes a significant higher job safety than an open TBM with conventional support. Each ring consists of four honeycomb segments with 20 cm thickness. After finalisation of the excavation a steel liner will be installed and concreted. The Joint Venture Jaeger-Seli will perform the two pressure shafts as a subcontractor for the Indian company Gammon India Ltd.
机译:印度的目标是在未来10年内将其电力容量从100 GW提升至200 GW。国家水电公司(NHPC)于2001年决定执行北部省喜马al尔邦库鲁区享有盛誉的2,051 MW帕尔巴蒂水力发电项目第二阶段的800兆瓦第二阶段工程。两条长度分别为1.542m的30°平行的倾斜地下压力井将在不同的地质构造中进行开挖,并由硬岩双盾构TBM衬砌成六角形混凝土段。这种标题对印度来说将是一个新颖的事物,对于倾斜的压力轴来说将是一种创新的方法。这款4.88m的Mitsubishi DS TBM将在可旋转的钢制平台上进行地下组装,该平台特别设计用于发射以及在每个竖井的上洞中接受TBM。六边形分段衬砌系统比使用传统支撑的开放式TBM具有更高的工作安全性。每个环由四个20厘米厚的蜂窝状部分组成。开挖完成后,将安装钢衬板并进行混凝土浇筑。合资公司Jaeger-Seli将作为印度公司Gammon India Ltd.的分包商执行两个压力轴的生产。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号