Refurbishment of the old Medway Bridge

机译:翻新旧的梅德韦大桥

获取原文
获取外文期刊封面目录资料

摘要

The original Medway Bridge comprises 21 spans of prestressed concrete beams and twin three-cell box girder construction with an overall length of almost 1 kilometre and a main span of 152.4 m. It carried both carriageways of the M2 motorway over the River Medway in Kent, UK. With the opening of the new Medway Bridge in August 2002 as part of the A2/M2 Cobham to Junction 4 widening scheme for the Highways Agency, all traffic on the existing bridge was temporarily diverted giving Costain-Skanska-Mowlem joint venture (CSM) full access to the viaduct superstructure to begin the final phase of the structural refurbishment. This paper details the design of some of the final refurbishment requirements and identifies the solutions developed to overcome several problems encountered on site during the strengthening. Key items of work included replacing a suspended span over the river, repairing the supporting prestressed concrete half joints and re-assessing the approach viaducts. The work was completed under a Design and Build contract, which made the need for economic and buildable details all the more acute. Emphasis was placed on the development of flexible solutions to cater for anticipated variations on site.
机译:原始的Medway桥包括21个跨度的预应力混凝土梁和双三格箱形箱梁结构,总长度将近1公里,主跨度为152.4 m。它在英国肯特郡的梅德韦河上载着M2高速公路的两条车道。随着2002年8月新的梅德韦大桥的开放,这是公路局A2 / M2科汉姆至交界处4拓宽计划的一部分,现有大桥上的所有交通都被暂时改道,使Costain-Skanska-Mowlem合资企业(CSM)完全进入高架桥上部结构以开始结构翻新的最后阶段。本文详细介绍了一些最终翻新需求的设计,并确定了为克服在加固过程中遇到的一些问题而开发的解决方案。关键工作包括更换河上的悬索桥,修复支撑的预应力混凝土半缝和重新评估引桥。这项工作是根据设计和建造合同完成的,这使得对经济和可建造细节的需求更加迫切。重点放在灵活解决方案的开发上,以适应现场的预期变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号