首页> 外文会议>SPE/ICoTA coiled tubing conference and exhibition >Optimizing Integrated Rigless Plug and Abandonment – A 60 Well Case Study
【24h】

Optimizing Integrated Rigless Plug and Abandonment – A 60 Well Case Study

机译:优化集成的无钻即插即用– 60井案例研究

获取原文

摘要

This paper presents the Petroleum Development of Oman (PDO) Rigless plug and abandonment (P&A) methodology, technologies & practices which resulted from the corporate goal to find a cost effective means to P&A obsolete oil wells. As the main Omani Oil Exploration & Development company, PDO is abandoning aging wells and fields and they must balance environmental and financial objectives. Technically sound abandonment practices are essential for long-term environmental protection. Many operators are revising their P&A procedures to ensure that abandoned reservoirs remain permanently sealed. During this 60 well pilot project PDO optimized their P&A practices by employing a rigless methodology as well as new technologies to minimize the cost of abandonment while still ensuring long term environmental protection from once prolific oil wells. Using a Coiled Tubing unit and eliminating the need for a rig can help speed up operations and reduce costs, while at the same time safeguarding environmental concerns. Typical savings of 30% over previous abandonment campaigns with a drilling rig have been achieved by PDO. This constituted a total saving of over $5M for this 60 well campaign.
机译:本文介绍了阿曼石油开发公司(PDO)的无钻堵漏(P&A)方法,技术和实践,这些方法,实践和实践源于公司的目标,即为P&A过时的油井找到经济有效的方法。作为阿曼石油勘探与开发的主要公司,PDO放弃了老旧的油井和油田,它们必须平衡环境和财务目标。从技术上讲合理的废弃做法对于长期环境保护至关重要。许多运营商正在修订其P&A程序,以确保废弃的水库保持永久密封。在这个60井试点项目中,PDO通过采用无钻方法和新技术来优化其P&A做法,以最大程度地降低废弃成本,同时仍然确保多产油井的长期环境保护。使用连续油管单元并消除了对钻机的需求,可以帮助加快作业速度并降低成本,同时保护环境。 PDO已比以前的钻机放弃活动节省了30%。这为60口井活动总共节省了超过500万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号