首页> 外文会议>SPE/IADC drilling conference >Deepwater Success Through Predictable and Distinctive Drilling andCompletion Performance
【24h】

Deepwater Success Through Predictable and Distinctive Drilling andCompletion Performance

机译:通过可预测和独特的钻探和完井性能获得深水成功

获取原文

摘要

Benchmarked results on well construction projects show thatmany projects incurred significant cost over runs. Half of themega projects since 1993 have been disasters resulting in adestruction of capital for oil companies. Insufficient drillingfront-end loading and inadequate team organization have beenidentified as preventable causes of these over runs.Deepwater projects involve multiple challenges of newtechnology, geological uncertainty and, often, a fast trackapproach. The wells’ portion of the total project cost oftenexceeds 50%. The huge price for intervention activities later inthe life of these wells requires that the initial completionremain in place and function as planned for a long time.Predictable and distinctive drilling and completionperformance is a must for the high cost projects thattypify deepwater.This paper will describe a methodology that has beensuccessfully applied with repeatable best in class results in theNorth Sea and Gulf of Mexico. This methodology addressesthe need that teams are organized to fit the project (not theother way around) and that systems integration is treated as ahigh priority. The results typically achieved with thismethodology are in the range 20 – 23 days per 10,000 ft – bestin class in both regions and 35% better than the averagedrilling time – with commensurate improvements inproduction and data acquisition. Short case histories ofdeepwater exploration and development wells are described –including a horizontal development well.The paper describes:- how the projects were organized,- how the teams were aligned to their objectiveand goals,- the processes that support these successful teams,- how the teams were motivated to perform,- how web based support can function to create colocationthrough the virtual world.The paper also contrasts this methodology withtraditional operations.
机译:井建设项目的基准结果表明: 许多项目的运行成本很高。一半的 自1993年以来的大型项目就是灾难,导致 破坏石油公司的资本。钻孔不足 前端加载和团队组织不足 被确定为这些超支的可预防原因。 深水项目涉及新项目的多重挑战 技术,地质不确定性,而且通常是快速通道 方法。总项目成本中的油井部分通常 超过50%。后期干预活动的巨额费用 这些油井的寿命要求初始完井 长期保持在原位并按计划运行。 可预测且独特的钻探和完井 性能是高成本项目必不可少的 代表深水。 本文将介绍一种已被 成功地应用了可重复的最佳同类结果 北海和墨西哥湾。该方法论解决 组织团队以适应项目的需要(不是 反之亦然),并且系统集成被视为 高优先级。这样做通常可以达到的结果 方法在每10,000英尺20到23天的范围内–最佳 在两个地区均处于一流水平,比平均水平高35% 钻孔时间–相应的改进 生产和数据采集。的短案例历史 描述了深水勘探和开发井– 包括一个水平开发井。本文描述: -项目的组织方式, -团队如何与其目标保持一致 和目标, -支持这些成功团队的流程, -激励团队表现的动力, -基于Web的支持如何用于创建主机代管 通过虚拟世界。 本文还将这种方法与 传统操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号