首页> 外文会议>SPE/IADC drilling conference >Risk Management Process for Ultra-deepwater Surface BOP Operations from a DPDrilling Rig
【24h】

Risk Management Process for Ultra-deepwater Surface BOP Operations from a DPDrilling Rig

机译:DPD钻机进行超深水地面防喷器作业的风险管理流程

获取原文

摘要

This paper describes the risk management process that wasundertaken for the first surface BOP operation to be executedfrom a Dynamically Positioned drilling vessel in ultradeepwater (9474 ft WD). The paper briefly describes the casefor change that presented itself to the operations drilling groupand outlines the steps that were taken in order to ensure thatthe overall safety of the operation was equal to, or superior to,that of conventional subsea operations. A number of the keyconclusions established from the risk management process arealso presented.
机译:本文介绍了风险管理流程 为执行第一表面防喷器操作而采取的措施 从超动态定位钻井船上 深水(9474英尺西数)。本文简要描述了这种情况 向运营演练小组展示的变革 并概述了为确保 手术的总体安全性等于或优于 传统的海底作业。一些关键 从风险管理过程中得出的结论是 还介绍了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号