首页> 外文会议>Grouting and Ground Treatment >CURTAIN GROUTING FOR THE ANTAMINA DAM, PERU Part 1 ― Design and Performance
【24h】

CURTAIN GROUTING FOR THE ANTAMINA DAM, PERU Part 1 ― Design and Performance

机译:秘鲁安塔米纳坝的帷幕灌浆第1部分―设计与性能

获取原文

摘要

A deep grouted cut-off was constructed as part of the 140 m high, concrete-faced rockfill dam at Antamina in the high Andes of Peru. Foundation conditions comprised upstream-dipping, contorted argillaceous rocks in the left abutment, varying to limestone with karstic solutioning in the right abutment. This potential for karst was of concern for ensuring the integrity of the dam cut-off and governed much of the rationale for defining curtain depths and for ensuring flexibility of grouting procedures. This, the first of two papers on the dam, concentrates on the design aspects of the curtain and foundation grouting philosophy. Curtain performance on impoundment to full height is then reviewed. The accompanying paper, (Ritchie et al., 2003 - this conference) describes the curtain construction.
机译:在秘鲁安第斯山高处的安塔米纳,140m高的混凝土面板堆石坝的一部分,建造了一个深层灌浆切除物。基础条件包括左基台向上游浸入,扭曲的泥质岩,右基台变为石灰岩和岩溶溶液。喀斯特的这种潜在发展潜力值得关注,以确保大坝止水带的完整性,并在很大程度上确定了幕布深度并确保了灌浆程序的灵活性。这是有关大坝的两篇论文中的第一篇,着重于帷幕和基础灌浆理念的​​设计方面。然后审查了蓄水到最高高度时的窗帘性能。随附的论文(Ritchie等,2003-本次会议)描述了窗帘的结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号