The Predictability Index - A Novel Project Performance Metric to Assess the Early Prediction of Cost and Time Outcomes

机译:可预测性指数 - 一种新颖的项目性能指标,以评估成本和时间成果的早期预测

获取原文
获取外文期刊封面目录资料

摘要

As a departure from the current state of practice, this study proposes to evaluate cost and schedule performance based on the early and accurate prediction of final outcomes, as opposed to the prevalent and reactive evaluation of final cost and schedule deviations at completion. Getting to know early in the delivery process the actual outcomes of a project enables project and corporate managers to undertake informed and proactive actions in a timely manner. To enable the assessment of predictability performance, a novel Predictability Index metric is proposed, investigated, and discussed. Based on the statistical analysis of data for 135 completed projects representing $29 billion in total installed costs, the Predictability Index measure is characterized and the major influencing factors on project predictability performance are unveiled. Also, actual case studies are discussed in order to illustrate the tangible benefits associated with the assessment of predictability performance to the project delivery process.
机译:作为目前的实践状态的偏离,本研究建议根据最终结果的早期和准确预测来评估成本和进度绩效,而不是对最终成本的普遍和反应评估以及完成时的安排偏差。在交付过程中早期了解,项目的实际结果使项目和企业管理人员能够及时地进行知情和主动行动。为了能够评估可预测性能,提出了一种新的可预测性指数度量,研究和讨论。基于135个完成项目的数据统计分析,代表总装成本为290亿美元,可预测性指数措施的特点,揭开了项目可预测性表现的主要影响因素。此外,讨论了实际的案例研究,以说明与对项目交付过程的可预测性能进行评估相关的有形益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号