首页> 外文会议>Construction research congress >SELECTING PILE CONSTRUCTION METHOD USING FUZZY APPROACH
【24h】

SELECTING PILE CONSTRUCTION METHOD USING FUZZY APPROACH

机译:采用模糊方法选择桩施工法

获取原文

摘要

The selection of pile foundation construction method depends mainly upon the subjective opinion of construction practitioners. Therefore, this experience has to be documented and stored in the intelligent company database for usage in future pile construction projects. This research introduces an attempt to store the experts' subjective experience using a fuzzy expert system (FES) or fuzzy model. The proposed model uses soil type, environmental conditions, water table position, and granular strata location as input variables. It produces the appropriate pile construction method and its associated membership value as outputs. The FES system is designated based upon construction facts and practitioners opinion. It is validated and a sensitivity analysis is performed to check its sensitivity to any changes in the inputs. It proves its robustness in selecting the appropriate pile construction method.
机译:桩基施工方法的选择主要取决于施工从业者的主观意见。因此,必须记录此经验并存储在智能公司数据库中,以便在未来的桩施工项目中使用。本研究介绍了尝试使用模糊专家系统(FES)或模糊模型来存储专家的主观体验。所提出的模型使用土壤类型,环境条件,水位位置和粒度位置作为输入变量。它产生适当的桩施工方法及其相关的成员值作为产出。 FES系统基于施工事实和从业者意见指定。它被验证,并执行灵敏度分析以检查其对输入中的任何变化的敏感性。它证明了选择适当的桩施工方法的鲁棒性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号