This study examines data from 41 industrial motor system optimization projectsimplemented between 1995 and 2001 that were developed into DOE case studies todetermine the effect of the energy savings brought about by such projects. The studycalculates aggregate energy savings, the net present value (NPV) of project savings, theinternal rates of return of project cash flow (IRR) for each project as well as for all projectsaggregated together and for projects having large capital expenditures versus those in whichthe systems were optimized primarily with engineering changes. Finally, the study makessome rough estimates of possible energy savings throughout US industry.For this study, projects are considered financially worthwhile if the NPV of theproject savings over a 10-year project life is greater than the project cost. Because the simplepayback criterion is the norm in the DOE case studies, it is used as a complementary measureof success.The initial results suggest that the NPV for most of the projects' savings in the sampleare positive with 10 and 15-year project lives and that many are even positive with 5-yearproject lives. For projects involving large capital purchases a project life of 10 years isrequired for a positive NPV while for projects that primarily involve engineering changes apositive NPV was achieved with a 5-year project life. This suggests that motor systemoptimization projects do not necessarily require large capital expenditures to achievesubstantial energy savings.
机译:这项研究检查了来自41个工业电机系统优化项目的数据 在1995年至2001年之间实施,并已发展为美国能源部(DOE)案例研究, 确定此类项目带来的节能效果。研究 计算总节能量,项目节约的净现值(NPV), 每个项目以及所有项目的项目现金流的内部收益率(IRR) 汇总在一起,以及与那些具有较大资本支出的项目相比, 系统主要通过工程变更进行了优化。最后,研究使 对整个美国行业可能节能的一些粗略估计。 在本研究中,如果项目的净现值等于 在10年的项目生命周期中节省的项目成本大于项目成本。因为简单 投资回报标准是美国能源部案例研究的规范,它是一种补充措施 成功。 初步结果表明,样本中大多数项目节省的净现值 对项目生命周期为10年和15年持积极态度,对项目生命周期5年甚至持积极态度 项目生活。对于涉及大量资本购买的项目,项目寿命为10年 对于正净现值而言是必需的,而对于主要涉及工程变更的项目来说, 五年的项目寿命实现了正的NPV。这表明电机系统 优化项目不一定需要大量的资本支出才能实现 节省大量能源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号