首页> 外文会议>7th U.S. National Conference on Earthquake Engineering >FAILURE ANALYSIS OF STRUCTURAL STEEL CONNECTIONS IN THE NORTHRIDGE AND LOMA PRIETA, CALIFORNIA EARTHQUAKES
【24h】

FAILURE ANALYSIS OF STRUCTURAL STEEL CONNECTIONS IN THE NORTHRIDGE AND LOMA PRIETA, CALIFORNIA EARTHQUAKES

机译:加利福尼亚地震北桥和洛马普里塔的结构钢连接失效分析

获取原文

摘要

There was extensive damage to steel beam-to-column moment connections in several hundred buildings caused by the January 17, 1994 Northridge, CA earthquake. Similar damage was found during 1995 inspections of buildings that experienced the 1989 Loma Prieta near San Francisco. Presented herein are stress analyses, results of full scale connection tests, and metallurgical fracture surface analyses that demonstrate that the state of stress and force distributions used in the design rationale of these steel moment connections was not correct. These analyses show that the stress, strain and force distributions were so unfavorable as to cause the "pre-Northridge" connection to fail due to low cycle fatigue. Results of cyclic cantilever beam-to-column connection tests are used herein to evaluate both the fracture modes and the accumulated seismic connection damage of the pre-Northridge, Dogbone and Slotted Web connections. These tests were made using the ATC-24 test protocol with the exception that the tip displacements of the beam-column assemblies were cycled at constant displacements from the initiation of the test until the connections fractured. Results of these tests are then used to demonstrate how accumulated seismic connection damage may be evaluated and to compare the performance of the three connections based upon a composite seismic interstory drift spectrum for a steel moment frame building. These concepts and methods may then be used to create Probable Maximum Loss (PML) surveys for buildings in seismic regions.
机译:1994年1月17日,加利福尼亚州北岭大地震对数百座建筑物的钢梁至柱弯矩连接造成了广泛破坏。在1995年对1989年旧金山附近的Loma Prieta建筑物进行检查时,发现了类似的损坏。本文介绍的是应力分析,全尺寸连接测试的结果以及冶金断裂表面分析,这些分析表明,在这些钢力矩连接的设计原理中使用的应力和力分布状态不正确。这些分析表明,应力,应变和力的分布是如此不利,以至于由于低循环疲劳而导致“前北岭”连接失效。此处使用循环悬臂梁到柱连接测试的结果来评估断裂模式以及预北脊,狗骨和开槽腹板连接的累积地震连接损伤。这些测试是使用ATC-24测试规程进行的,不同的是,从测试开始到连接断开,梁柱组件的尖端位移以恒定位移循环。然后,将这些测试的结果用于说明如何评估累积的地震连接破坏,并基于用于钢力矩框架建筑物的复合地震层间漂移谱比较三个连接的性能。这些概念和方法随后可用于为地震区域中的建筑物创建可能的最大损失(PML)调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号