首页> 外文会议>Traffic and Transportation Studies >Setting Up and Research of the Dispatching System of Jing-Hu High-speed Railway
【24h】

Setting Up and Research of the Dispatching System of Jing-Hu High-speed Railway

机译:京沪高铁调度系统的建立与研究

获取原文

摘要

The full length of Jing-Hu high-speed railway is 1307 km from Beijing to Shanghai. There are 30 stations along the whole line. The existing Jing-Hu line will be joined with the hubs at Beijing, Tianjin, Jinan, Xuzhou, Bengfu and Shanghai. It will introduce the existing passenger stations at the above hubs and the new passenger stations to be built. In the light of specific conditions of China, the completed Jing-Hu high-speed railway will adopt the mode of alternating transportation between high-speed and mid-speed. The mid-speed trains on the existing lines will go up or down the high-speed lines at the above hubs. Thus, when the mid-speed trains running on the existing lines go up or down the high-speed lines in state of chaos, the trains running on the high-speed lines will be greatly affected, thus it will need the dispatching system on the high-speed lines and the existing lines to conduct coordinating and linking. According to the designing plan of Jing-Hu high-speed railway (TSRI, 2000), high-speed and mid-speed, mid-speed and ordinary-speed yards will be set up accordingly within the stations at Beijing, Tianjing west, and Jinan. The high-speed and mid-speed yards and mid-speed and ordinary-speed yards will share the throat. High-speed and mid-speed yards and mid-speed and ordinary-speed yards are also set up in Nanjing station, but they do not share the throat. There are no dispersing yards in the stations of Xuzhou and Shanghai. Trains have mixed use of tracks. The new Bengfu is a newly built high-speed station. Besides, on the section from Beiyuan station to Jinan station within Jinan hub, on both ends of Xuzhou station, on the section from Shanghai west to Shanghai station within Shanghai hub, the Jing-Hu high-speed railway and the existing Jing-Hu railway share the same line. Within these hubs, there are some interacting related operations between the two control systems. Thus the problem arises for the traffic control system to link up and connect between the high-speed lines and the existing lines.
机译:京沪高铁从北京到上海全长1307公里。全线有30个车站。现有的京沪线将与北京,天津,济南,徐州,蚌埠和上海的枢纽连接。它将介绍上述枢纽的现有客运站以及将要建造的新客运站。根据中国的具体情况,建成的京沪高铁将采取高速与中速交替运输的方式。现有线路上的中速列车将在上述枢纽的高速线路上上落。因此,当现有线路上运行的中速列车在混乱状态下在高速线路上上下行驶时,高速线路上运行的列车将受到很大影响,因此需要在该线路上的调度系统。高速线路与现有线路进行协调和链接。根据京沪高铁的设计方案(TSRI,2000),将在北京,天津西和天津站内相应地设置高,中速,中速和普通速车场。济南高速和中速码以及中速和普通速码将共享喉咙。南京站也设立了高速中速堆场和中速和普通速度堆场,但它们没有共同点。徐州和上海的车站没有分散场。火车混合使用轨道。新的蚌埠是新建的高速车站。此外,在济南枢纽的北苑站至济南站的一段,徐州站的两端,上海西至上海枢纽内的上海站的一段,京沪高铁和现有京沪铁路共享同一行。在这些中心内,两个控制系统之间存在一些交互的相关操作。因此,交通控制系统在高速线路和现有线路之间链接和连接出现了问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号