首页> 外文会议>eWork and eBusiness in Architecture, Engineering and Construction >Web-based situated communication model for construction management
【24h】

Web-based situated communication model for construction management

机译:基于Web的施工管理位置通信模型

获取原文

摘要

Conventionally, construction management is a data-driven management process. However, most of construction problems under the real construction situation are hard to predicate during the planning stage. For modeling such a dynamic, interactive collaborative process, we adopt a concept called "reflective learning" and "learning-by-doing" from (Schank 1997, Schoen 1983). In addition, by using acting-role interactive model (Chang and Huang 2002) as the conceptual communication metaphor, this paper presents a situated communication model for construction management. The behavior of such communication model is discussed through a case study―lope land leveling process. Web-based implementation architecture is proposed and some implication and research results are discussed in the paper.
机译:按照惯例,施工管理是一个数据驱动的管理过程。但是,在规划阶段很难预测实际施工情况下的大多数施工问题。为了建立这样一个动态的,交互式的协作过程的模型,我们采用了一种名为“反思性学习”和“边做边学”的概念(Schank 1997,Schoen 1983)。此外,通过使用角色交互模型(Chang and Huang 2002)作为概念性的沟通隐喻,本文提出了一种施工管理中的情境沟通模型。通过案例研究-坡地平整过程来讨论这种通信模型的行为。提出了基于Web的实现体系结构,并对其中的一些含义和研究成果进行了讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号