首页> 外文会议>Reservoirs in a Changing World >Breaclaich Dam - upstream face joint bandage sealant and wavewall refurbishment works
【24h】

Breaclaich Dam - upstream face joint bandage sealant and wavewall refurbishment works

机译:Breaclaich大坝-上游工作面绷带密封胶和防波堤翻新工程

获取原文

摘要

Breaclaich is a 26 m high, 434 m long concrete faced rockfill dam. Areas of the concrete panel joints were progressively deteriorating and leakage monitoring confirmed a clear upward trend with leakage on occasions exceeding the previously determined maximums established under the Reservoirs Act. The wave wall was noted in the original form of record as being of indifferent appearance and alignment, both of which had continued to deteriorate with time to an unacceptable level. Recent design calculations demonstrated that the wavewall would be unstable under design wave surcharge conditions.
机译:布雷克拉希(Breaclaich)是一座高26 m,长434 m的混凝土面板堆石坝。混凝土面板接缝的区域逐渐恶化,泄漏监测证实了明显的上升趋势,有时泄漏量超过了根据《水库法》预先确定的最大值。在最初的记录形式中,防波墙的外观和排列方式都没有变化,但随着时间的流逝,两者都继续恶化到无法接受的水平。最近的设计计算表明,在设计波浪附加条件下,波浪墙将变得不稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号