首页> 外文会议>Reservoirs in a Changing World >Rehabilitation of old masonry dams at full reservoir level A comparison of successful rehabilitation projects
【24h】

Rehabilitation of old masonry dams at full reservoir level A comparison of successful rehabilitation projects

机译:在整个水库水平面修复旧砌筑大坝-比较成功的修复项目

获取原文

摘要

At the beginning of the last century about 40 gravity dams were built in Germany. During the last years extensive rehabilitation measures were carried out at several old masonry dams. Rehabilitation concepts which called for the construction of inspection/drainage galleries inside the dams turned out to be rather cost-efficient. Different methods for the construction of these inspection galleries were used - from manual driving of the tunnel to the drill & blast method and the use of a tunnel boring machine. The specific costs of these galleries varied, depending on the construction method.
机译:上世纪初,德国建造了约40个重力坝。在过去的几年中,在几座旧砖石水坝上进行了广泛的修复措施。要求在大坝内建造检查/排水通道的修复概念非常具有成本效益。这些检查通道的建造方法多种多样-从手动驾驶隧道到爆破法,再到使用隧道掘进机。这些画廊的具体成本因建造方法而异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号