Two structures with reinforced concrete foundation components comprise the Polar Continental Shelf Project in Resolute, on Cornwallis Island, the northernmost outpost in Arctic Canada. One is an accommodation building, and the other is a converted hangar for laboratories and equipment. This is a base for scientific expeditions in the Arctic. The foundations were constructed in 1988 and within two years severe deterioration of the concrete was seen. Sampling was carried out under severe Arctic conditions. Investigation determined that the cause of the damage was the formation of thaumasite in the mature concrete. The determination of the cause, the first instance recorded in Canada, involved tests by an international multi-disciplinary team. Since the disease was progressive and could destroy all the foundations, and because suitable materials were not available on site, innovative and different repairs were devised for the two structures, and made in 1993. In the accommodation building the piers supporting the building were isolated from further contact with the sulphate waters present during the summer thaw. The foundations in the laboratory building were replaced by resin concrete designed specifically for low temperature applications. The components of the materials used for grout and concrete on both buildings had to be flown to Resolute. Deficiencies in the execution of the repair contract led to the resin concrete foundations being replaced in 1995 by the repair contractor at no expense to the owner.
机译:两个由钢筋混凝土基础组成的结构包括位于加拿大北极最北端康沃尔利斯岛的Resolute的极地大陆架项目。一个是住宿大楼,另一个是改建后的实验室和设备机库。这是北极科学考察的基础。地基建于1988年,两年内看到混凝土严重变质。采样是在严酷的北极条件下进行的。调查确定损坏的原因是在成熟混凝土中形成了硅铝矾石。确定原因的最初记录在加拿大,涉及国际多学科团队的测试。由于该疾病是进行性疾病,可能破坏所有地基,并且由于现场没有合适的材料,因此对这两个结构进行了创新性和不同的维修,并于1993年进行了建造。进一步与夏季解冻期间存在的硫酸盐水接触。实验室大楼的地基被专为低温应用设计的树脂混凝土所取代。两座建筑物中用于灌浆和混凝土的材料的成分必须经过空运到Resolute。维修合同执行过程中的缺陷导致树脂混凝土基础在1995年被维修承包商免费更换,而业主则不承担任何费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号