Past finite element analysis of pillar mining effects on the Ross Shaft at the Homestake Mine in Lead, SD, indicated stability of the shaft during mining on both sides of a central pillar that was defined within a much larger original shaft pillar. Experience with pillar mining that began in 1988 verified the earlier forecast of stability. Mining of the remaining central portion of the original pillar began in early 1995. A "cave" occurred in 1996 that led to a temporary cessation of pillar mining; pillar mining began anew in 1997 and continued for a short period. A relatively small portion of the central pillar remains. Previous pillar mining on north and south sides of the central pillar and mining between the central pillar and the Ross Shaft as well as top and bottom sill development have isolated the ore remaining. Thus, one intuitively expects little effect of final mining on the Ross Shaft. Results of the present study confirm this expectation and show very little change in shaft stability as a consequence of mining the ore remaining in the central portion of the original shaft pillar. Comparisons of three-dimensional finite element model displacements with borehole extensometer measurements that began in June, 1944, reinforce this conclusion.
机译:过去对SD铅厂霍姆斯特克矿山的Ross井筒上的柱子开采影响进行的有限元分析表明,在开采过程中,在一个更大的原始井筒柱中定义的中央柱子两侧均具有竖井的稳定性。 1988年开始的支柱开采经验证实了对稳定性的早期预测。 1995年初开始开采原始支柱的其余中央部分。1996年发生了一次“崩塌”,导致暂时停止了支柱开采。支柱开采于1997年重新开始,并持续了很短一段时间。中心支柱的一小部分仍然保留。先前在中央支柱的南北两侧进行的支柱开采以及在中央支柱与Ross竖井之间的采矿以及顶部和底部门槛的开发都将剩余的矿石隔离开来。因此,直觉上期望最终采矿对Ross Shaft的影响很小。本研究的结果证实了这一期望,并且由于开采了残留在原始竖井中部的矿石,竖井稳定性几乎没有变化。 1944年6月开始的三维有限元模型位移与井眼引伸计测量结果的比较证实了这一结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号