首页> 外文会议>POWER-GEN international conference >LONG TERM EFFECTS OF GAS TURBINE EQUIPMENT UPGRADES ON THE OVERALLPLANT PERFORMANCE AND ECONOMICS
【24h】

LONG TERM EFFECTS OF GAS TURBINE EQUIPMENT UPGRADES ON THE OVERALLPLANT PERFORMANCE AND ECONOMICS

机译:燃气轮机设备升级对整体电厂性能和经济的长期影响

获取原文

摘要

Using the example of a combined cycle plant with district heat export, this paper presents a tooland methodology to evaluate the economic impact of gas turbine upgrades on the overall planteconomics. The tool to predict plant performance with all the details necessary to account forchanging ambient and load conditions, process requirements and economic background is a heatbalance and economics software package. Linking detailed off-design analysis of the plant withall economic parameters of the plant operation, plant revenues and expenses are assessed overthe expected plant life cycle. Based on economic key numbers as e.g. net present value and ROI,the value of the equipment upgrade to the plant is elucidated.
机译:以带区域供热的联合循环电厂为例,本文介绍了一种工具 和方法来评估燃气轮机升级对整个工厂的经济影响 经济学。预测工厂性能的工具,其中包含所有必要的详细信息 不断变化的环境和负载条件,过程要求和经济背景是一种热 平衡与经济学软件包。将工厂的详细非设计分析与 对工厂运营的所有经济参数,工厂收入和支出进行评估 预期的植物生命周期。根据经济键号,例如净现值和投资回报率, 阐明了设备升级到工厂的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号