首页> 外文会议>American Wind Energy Association conference >EVALUATION OF LIGHTNING PROTECTION RETROFIT ON THE Z-750’S IN SPRINGVIEW, NEBRASKA
【24h】

EVALUATION OF LIGHTNING PROTECTION RETROFIT ON THE Z-750’S IN SPRINGVIEW, NEBRASKA

机译:内布拉斯加州SPRINGVIEW的Z-750的防雷改造评估

获取原文

摘要

In late 1998, Enron installed two Z-750 turbines in Springview, Nebraska, as part of the DOEEPRITurbine Verification Program. During a lightning storm in July 1999, the turbinessustained lightning damage, including destruction of a blade. Following the damage, a series ofturbine electrical wiring modifications were made to the units. The wiring modifications weredeveloped with support from the TVP program. In June 2000, Enron installed the LightningGuard I retrofit, which included conductors in the blades. The summer of 2000 was a severesummer for lightning activity in the Springview area; however, the turbines experienced onlyminor damage.This paper presents a review of the lightning risk, a summary of lightning damage sustained in1999 compared to 2000, and a description of the wiring modifications and Lightning Guard Iretrofit installed at the site. NPPD presents a utility’s perspective on the effectiveness oflightning protection in the Midwest.
机译:1998年下半年,安然公司作为DOEEPRI的一部分,在内布拉斯加州斯普林维尤安装了两台Z-750涡轮机 涡轮验证程序。在1999年7月的雷雨中,涡轮机 遭受持续的雷击损坏,包括损坏叶片。损坏之后, 机组进行了涡轮电气接线的修改。接线修改是 在TVP计划的支持下开发。 2000年6月,安然(Enron)安装了Lightning Guard I改造,其中包括刀片中的导体。 2000年的夏天非常严酷 夏天在斯普林维尤(Springview)地区进行闪电活动;但是,涡轮机只经历了 轻微损坏。 本文对雷击风险进行了综述,总结了雷击中遭受的雷击危害。 1999年与2000年相比,并描述了接线修改和Lightning Guard I 改造安装在现场。 NPPD介绍了公用事业公司对以下方面的有效性的看法: 中西部的雷电防护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号