Foreshore Nourishment-More Sand but Lower Costs

机译:滨海养料-更多沙子,但成本更低

获取原文

摘要

The Dutch people have a long history of creating new land and defending their properties against the sea. A short historical view of the Dutch policy on coastal defense is given. In some more detail the policy of the last decade is highlighted. In 1990 the Dutch government decided to maintain its coastline by means of beach nourishment projects. Since 1990 nearly 300 USS million is spent on replenishing the sandy coast of the Netherlands. In most of these projects conventional beach nourishment methods were used. The conventional method of using midsize trailing suction hopper dredges, which pump the sand ashore through a temporary pipeline is shortly described. Recently a new method of nourishment has been used for coastline maintenance, so called foreshore nourishments. The sand is not placed on the beach but dumped on the foreshore, five meters below sea level. This method will save costs significantly. No pipeline is required and operations can be carried out during the recreational season. Since the sand is dumped using bottom doors instead of pumped ashore, the cycletime of the dredge and consequently the costs decrease. In the paper the research, design, dredging operations, monitoring and current results of some foreshore nourishment projects are described. A significant part of the costs of a contract is related to risk management. Due to the specific conditions in a highly dynamic coastal zone with changing weather conditions, working on a nourishment project is not always possible and sandlosses may occur, causing a risk premium up to 40%. In the period 1997-1999 the Dutch Ministry of Transport and Public Works carried out five foreshore nourishment test projects in which they took all the operational risk. This resulted in a further decrease of costs. The Ministry of Transport and Public works managed the risk by directing the vessels to inland channel maintenance projects during time of bad weather conditions. The paper describes the contractual aspects of projects. Currently the Ministry of Transport and Public Works is preparing a partnering or alliance contract for a nourishment project. The basic idea behind this is an optimal use of the strengths of the parties involved and their ability to manage risks. This may result in flexible long term contracts for an adequate and cost effective coastline maintenance.
机译:荷兰人民拥有创造新土地和保护自己的财产免受海洋侵害的悠久历史。简要介绍了荷兰关于海防的政策的历史观点。详细介绍了过去十年的政策。 1990年,荷兰政府决定通过海滩营养项目来维持海岸线。自1990年以来,将近300万美元的资金用于补充荷兰的沙质海岸。在大多数这些项目中,使用了常规的海滩养料方法。简短描述了使用中型后吸料斗挖泥机的传统方法,该挖泥机通过一条临时管道将沙子泵入岸上。最近,一种新的营养方法已用于海岸线维护,即所谓的前滨营养法。沙子不是放在沙滩上,而是倒在海平面以下五米的前滩上。这种方法将大大节省成本。不需要管道,可以在娱乐季节进行操作。由于沙子是通过底门倾倒而不是被泵送到岸上,因此挖泥机的周期时间缩短,从而降低了成本。在本文中,描述了一些滨海营养项目的研究,设计,疏operations操作,监测和当前结果。合同成本的很大一部分与风险管理有关。由于高动态沿海地区的特殊条件以及不断变化的天气条件,并非总是能够开展营养项目,并且可能会发生沙漏,从而导致高达40%的风险溢价。在1997年至1999年期间,荷兰运输和公共工程部实施了五个滨海营养测试项目,其中承担了所有运营风险。这导致成本进一步降低。运输和公共工程部通过在恶劣天气期间将船只引导至内陆通道维修项目来管理风险。本文描述了项目的合同方面。目前,运输和公共工程部正在为营养项目准备合作或联盟合同。这背后的基本思想是最佳地利用有关各方的优势及其管理风险的能力。这可能会产生灵活的长期合同,以进行适当且具有成本效益的海岸线维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号