首页> 外文会议>Waterpower conference >A System’s Approach to Tactical Planning at Rock Island Dam
【24h】

A System’s Approach to Tactical Planning at Rock Island Dam

机译:岩岛大坝战术规划的系统方法

获取原文

摘要

Public Utility District Number 1 (PUD) of Chelan County owns and operates the RockIsland Hydroelectric Project (Rock Island Dam) on the upper Columbia River inWashington State.Chelan’s Juvenile Fish Protection Program (JFPP) developed a Tactical Plan to 1)define the Rock Island Dam system, 2) its priorities and objectives and 3) provide aframework for understanding operational constraints and impacts of implementing thedraft Habitat Conservation Plan (HCP) provisions as part of the Endangered SpeciesAct (ESA) requirements and Clean Water Act (CWA) requirements (e.g., total dissolvedgas).The Tactical Plan is being used to provide a uniform and consistent basis for guidingtechnical studies and evaluating the impact of system changes. The heart of theTactical Plan is a system model - a graphical representation of the Rock Island Damsystem. This system model is used to help the PUD:· Educate staff about the impacts of their decisions within the JFPP on the system’sobjectives.· Plan JFPP studies and implementation activities (e.g., prioritize data collectionefforts, minimize the costly collection of unnecessary data).· Conduct scenario analyses to understand the impacts of different options on theHCP, CWA and operational objectives.The system model developed as part of the Tactical Plan is the first step in developing alarger and more comprehensive computerized (I.e., dynamic) system model of RockIsland Dam. The PUD hopes that the system model can be used to discuss projectissues internally with a common understanding as well as externally with regulators andagencies.
机译:奇兰县1号公用事业区(PUD)拥有并经营该岩石 哥伦比亚上游哥伦比亚河上的岛屿水电工程(洛克岛水坝)。 华盛顿州。 奇兰的幼鱼保护计划(JFPP)将战术计划制定为1) 定义岩岛大坝系统; 2)其优先级和目标; 3)提供一个 理解运营约束和实施影响的框架 作为濒危物种的一部分的人居保护计划(HCP)条款草案 法案(ESA)要求和清洁水法案(CWA)要求(例如,总溶解量 气体)。 战术计划被用来为指导提供统一和一致的基础 技术研究和评估系统变更的影响。的心 战术计划是一个系统模型-岩岛大坝的图形表示 系统。此系统模型用于帮助PUD: ·向员工介绍JFPP中的决策对系统的影响 目标。 ·计划JFPP研究和实施活动(例如,优先收集数据 努力,最大程度地减少不必要的数据的昂贵收集)。 ·进行情景分析,以了解不同选项对客户的影响 HCP,CWA和运营目标。 作为战术计划一部分而开发的系统模型是开发战术模型的第一步。 Rock的更大,更全面的计算机化(即动态)系统模型 岛水坝。 PUD希望可以使用系统模型来讨论项目 内部有共识的问题,以及外部与监管机构的问题; 机构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号