首页> 外文会议>Waterpower conference >BUILDING CONSENSUS AT ITA
【24h】

BUILDING CONSENSUS AT ITA

机译:在ITA建立共识

获取原文

摘要

The Itá Hydroelectric Project environmental impact studies were the ?rst inBrazil conducted, in the 80’s, under the new strict Brazilian environmental laws.Together with this new emerging legislation, the country was going through apolitical opening process after being under a dictatorship regime for about 20years. It was within this changing political and social scenery that the developersbegan to perform the environmental studies and to negotiate with the affectedpopulation the measures to relocate and compensate towns, villages andfamilies from the areas that would be ?ooded. This called for the creationof ground breaking social and environmental solutions, which would make upfor the impacts caused by the project and allow some understanding to buildconsensus among the developer, leaders from the affected population andenvironmental agencies, gaining approval for the construction of the powerplant.
机译:Itá水力发电项目的环境影响研究是 巴西是在80年代根据新的严格的巴西环境法进行的。 连同这项新出现的立法,该国正在经历一项 在独裁政权统治约20年之后的政治开放进程 年。正是在这种不断变化的政治和社会风光中,开发商 开始进行环境研究并与受影响的人进行谈判 人口搬迁和补偿城镇,村庄和村庄的措施 来自将被洪水淹没的地区的家庭。这需要创造 突破性的社会和环境解决方案,这将构成 对项目造成的影响,并让他们有所了解 开发人员,受影响人群的领导者之间的共识以及 环保机构,获得电力建设的批准 植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号