Providing a stable production stream with minimal GLR fluctuations to surface is a critical factor when designing gas-lift systems for subsea applications. As well intervention methods are very costly, the sub-surface gaslift equipment must be designed for the life of the well and the unloading and operating procedures must be tailored to minimize erosion of the gaslift valves and orifice.
展开▼