首页> 外文会议>New horizons in drinking water >Innovative Design and Process Selection for New Water Source and Supply System
【24h】

Innovative Design and Process Selection for New Water Source and Supply System

机译:新型水源和供水系统的创新设计和工艺选择

获取原文

摘要

Hall County (County), Georgia is one of the fastest growing counties in the metropolitan Atlanta Region. The County is in the process of developing a raw water supply, reservoir and a water treatment plant (Plant) to meet anticipated growth. The source water for the proposed plant will be a reservoir that is filled from two surface water sources.The primary objectives of this paper focuses on the development of a new water supply and treatment system for the County that addresses the following issues:1. Flood issues at the raw water pump station site2. Strict water withdrawal and minimum release requirements from the raw water intake3. Wide variation in the raw water quality4. Concerns associated with runoff quality due to land use.5. Wide variations in the water level in the proposed storage reservoir6. Current and future drinking water regulations7. Allow for future increase in system demands and required Plant capacity.
机译:佐治亚州的霍尔县(县)是亚特兰大都会区发展最快的县之一。该县正在开发原水供应,水库和水处理厂(工厂),以满足预期的增长。拟建工厂的水源将是一个由两个地表水源填充的水库。 本文的主要目标集中在为该县开发一种新的供水和处理系统上,以解决以下问题: 1.原水泵站现场的洪水问题 2.严格的取水量和最低的原水入口排放量要求 3.原水水质差异很大 4.与土地使用引起的径流质量有关的担忧。 5.拟建水库的水位变化很大 6.当前和将来的饮用水法规 7.允许将来系统需求和所需工厂容量的增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号