Leakage from cvcs pipe of regenerative heat exchanger induced by high-cycle thermal fatigue at tsuruga nuclear power station unit 2

机译:鹤冈核电站2号机组高周热疲劳引起再生换热器CVC管泄漏

获取原文

摘要

On July 12, 1999 while Tsuruga-2, PWR 4-loop plant, wa soperating at full power (1, 160 MWe), unidentified leakage inside the primary containment vessel was detected. As the leakage was identified, the plant promptly started to proceed to cold shutdown. Visual inspection after an isolation of the CVCS (Chemical & Volume Control System) revealed that the leakage was from a connecting pipe betweent he middle and lower stages in the CVCS regenerative heat exchanger.
机译:1999年7月12日,当压水堆4回路Tsuruga-2电厂全功率运转(1,160 MWe)时,检测到主安全壳内未发现泄漏。发现泄漏后,工厂立即开始进行冷停车。隔离CVCS(化学和体积控制系统)后,目视检查发现泄漏来自CVCS蓄热式热交换器中,下两级之间的连接管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号