首页> 外文会议>2000 International Conference on Power System Technology >IMPROVEMENT OF DYNAMIC STABILITY OF YUNNAN PROVINCE AND SOUTH-CHINA POWER SYSTEM BY POWER SYSTEM STABILIZER (PSS)
【24h】

IMPROVEMENT OF DYNAMIC STABILITY OF YUNNAN PROVINCE AND SOUTH-CHINA POWER SYSTEM BY POWER SYSTEM STABILIZER (PSS)

机译:用电力系统稳定器(PSS)改善云南省和南中国电力系统的动态稳定性

获取原文
获取外文期刊封面目录资料

摘要

For solving the dynamic instability problem of Yunnan Province Power System (YNPS) and the South China Interconnected Power System (SCEPS), Lubuge hydropower plant was chosen to install Power System Stabilizer (PSS). The philosophy to set the parameters of PSS is to provide positive damping within the frequency of 0.4~1.6 HZ especially 0.4~1.0 HZ and to be adaptive to various operating conditions. Based on the phase compensation and the root-locus method, the setting of PSS was chosen. Further eigenvalue and the time domain simulation studies show that the setting is well adaptive to different operating conditions and can significantly improve the system damping. In the field tests, the frequency response measurements and the performance of PSS under different operating condition were carried out. The test results show that the PSS installed can significantly improve the system damping. The PSSs of Lubuge power plant have been put into service in August,1995 and working well since then. There were several incidents of serious faults occurred in YNPS and SCEPS, no apparent power oscillation observed in generators or tie lines.
机译:为了解决云南省电力系统(YNPS)和华南互联电力系统(SCEPS)的动态不稳定问题,选择了鲁布格水电站安装电力系统稳定器(PSS)。设置PSS参数的原则是在0.4〜1.6 HZ(尤其是0.4〜1.0 HZ)的频率范围内提供正阻尼,并适应各种工作条件。基于相位补偿和根轨迹方法,选择了PSS的设置。进一步的特征值和时域仿真研究表明,该设置可以很好地适应不同的运行条件,并且可以显着提高系统的阻尼。在现场测试中,在不同的工作条件下进行了频率响应测量和PSS性能。测试结果表明,安装的PSS可以显着改善系统阻尼。卢布格电厂的PSS于1995年8月投入运行,此后运行良好。在YNPS和SCEPS中发生了几起严重故障事件,在发电机或联络线上未观察到明显的功率振荡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号