首页> 外文会议>INMM annual meeting >Safeguards Experience on the DUPIC Fuel Cycle Process
【24h】

Safeguards Experience on the DUPIC Fuel Cycle Process

机译:DUPIC燃料循环过程的保障经验

获取原文

摘要

Safeguards have been applied to the R&D process for directly fabricating CANDU fuel with PWRspent fuel material. Safeguards issues to be resolved were identified in the areas such as internationalcooperation on handling foreign origin nuclear material, technology development of operator'smeasurement system of the bulk handling process of spent fuel material, and a built-in C/S system forindependent verification of material flow. The fuel cycle concept (Direct Use of PWR spent fuel inCANDU, DUPIC) was developed in consideration of reutilization of over-flowing spent fuel resources atPWR sites and a reduction of generated high level wastes. All those safeguards issues have been finallyresolved, and the first batch of PWR spent fuel material was successfully introduced in the DUPIC labfacility and has been in use for routine process development.
机译:在研发过程中已经采取了保障措施,以直接利用压水堆制造CANDU燃料 乏燃料。在国际领域确定了需要解决的保障问题 合作处理国外核材料,运营商技术开发 乏燃料物料的批量处理过程的测量系统,以及一个内置的C / S系统,用于 物料流的独立验证。燃料循环概念(直接使用PWR乏燃料用于 CANDU,DUPIC)的开发是考虑到 压水堆场和减少产生的高放废物。所有这些保障措施问题终于解决了 解决方案,并且第一批PWR乏燃料材料已成功引入DUPIC实验室 设施,并已用于常规工艺开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号