首页> 外文会议>International conference on structural mechanics in reactor technology;SMiRT-15 >Elastic Plastic Finite Element Analysis of a BWR Feed Water Distributor Exposed to an Extreme Pressure Load
【24h】

Elastic Plastic Finite Element Analysis of a BWR Feed Water Distributor Exposed to an Extreme Pressure Load

机译:承受超压负荷的BWR给水分配器的弹性塑性有限元分析

获取原文

摘要

During a hypothetical break of a BWR feed water line, the feed water distributor (FWD) inside the RPV is subjected to a high pressure load for a short time (10 ms). Because of the sudden coolant release from the inner volume of the FWD there is a pressure difference between the inner and outer surface. It is conservatively assumed that the pressure difference nearly can reach the operating pressure for a few milliseconds. The distributor box and the ring line of the feed water distributor are modelled with shell and volume elements capable of being used for large strain analyses with elastic-plastic material behaviour. It is demonstrated by non-linear static calculations (without consideration of the inertia of the material) that a buckling instability occurs at about 60
机译:在假设的BWR给水管线中断期间,RPV内部的给水分配器(FWD)在短时间内(10 ms)承受高压负荷。由于冷却液突然从FWD的内部容积中释放出来,因此内表面和外表面之间存在压力差。保守地假设压力差可以在几毫秒内达到工作压力。给水分配器箱和给水分配器的环线均采用壳和体积元素进行建模,这些元素可用于通过弹塑性材料行为进行大应变分析。通过非线性静态计算(不考虑材料的惯性)证明,屈曲不稳定性发生在大约60

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号