Ursa TLP Well Sytems

机译:Ursa TLP井系统

获取原文

摘要

The original Ursa TLP development plan called for 16 production wells, 11 firm and 5 contingent Initial design was for 11 TLP wells and 3 subsea wells. The plan also included batch setting 21 well positions and pre-drilling 6 of the TLP wells in 3,950' of water in MC block 810. IN late 1997 a significant shallow flow occurred at the batch set site during the final batch operatons. Events proceeded such that all wells were lost and the site became unusable for the foundation support. Development plans were modified to move the installation site to an area with still significant but smaller shallow flow risk in MC block 809, in 3,800' of water. The batch set was reduced to only 12 TLP production wells. Drilling was to proceed with 1 to 2 pre-drills. Subsea wells were deleted from the plan. This paper disusses the Ursa well systems including early drilling, final batch set and pre-drills, the STSLP rig, riser systems and completion systems. It presents how these areas approached shoallow flow and the other challenghes to produce the Ursa reservoirs.
机译:Ursa TLP最初的开发计划要求16口生产井,11口牢固油井和5支临时性初始设计是针对11口TLP井和3口海底油井。该计划还包括在MC区块810的3,950'水中分批设置21口井位置和TLP井的预钻6口。1997年底,在最后的批操作期间,在批设置现场发生了明显的浅水流。事情进行得如此之快,以致所有的井都丢失了,并且该场地无法用于基础支持。修改了开发计划,以将安装地点移至MC区块809中3,800'水中的显着但较小的浅流风险区域。批处理组减少到只有12个TLP生产井。钻探要进行1到2次预钻。海底油井已从计划中删除。本文讨论了Ursa井系统,包括早期钻井,最终批次设置和预钻井,STSLP钻机,立管系统和完井系统。它介绍了这些地区如何处理浅水流和其他挑战,从而产生了Ursa水库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号