首页> 外文会议>Annual offshore technology conference >Operations Role in the Design and Commissioning of the Ursa TLP
【24h】

Operations Role in the Design and Commissioning of the Ursa TLP

机译:在Ursa TLP设计和调试中的运营角色

获取原文

摘要

Shell Deepwater Production Inc.'s (SDPI) tension leg platforms (TLP's) have offered unique challenges to overcome. Among these challenges is the staffing and training of operations personel. The process used to accomplish this on Ursa TLP has enabled operations to play a unique and valuable role in the design, commissioning the start-up of th project. This apper will review Operations key roles for the design and commissioning phase of Ursa TLP.
机译:壳牌深水生产公司(SDPI)的张紧腿平台(TLP)提供了独特的挑战来克服。这些挑战包括操作人员的人员配备和培训。在Ursa TLP上完成此任务的过程使操作能够在设计中发挥独特而宝贵的作用,从而启动了该项目的启动。该任命人员将审查Ursa TLP设计和调试阶段的运营关键角色。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号