摘要

The Morpheth project included a first of its kind installation of a mini-TLP in 1670 feet of water, from the J.Ray McDermott (JRM) DB50, a dynamically positioned derrick barge. The installation made maximum use of existing equipment and was performed using conventional techniques. Large diameer, single-piec piles were upended, free- stabbed and deriven to precise tolerances. Multi-section tendons were installed onto the piles in advance of th STLP hull and held in tension using temporary buoyancy modules. The TLP hull was loaded out and dry towed to site on a standard cargo barge. The hull was lifted and stabbed over the pre-installed tendons by a derrick barge. Trim adjustement of the TLP during ballasting and tendon lock-off was achieved using the hull ballast takns and a system of control winches. Systems were used that allowed remote control of the gull ballasting and tendon tension moitoring systems from the construction vessel. Thje plantform topsides installation was a conventional Gulf of Mexico integrated deck lift.
机译:Morpheth项目包括在动态定位的井架驳船J.Ray McDermott(JRM)DB50中,在1670英尺水深处首次安装微型TLP。该安装最大程度地利用了现有设备,并使用常规技术进行了安装。大直径单桩桩被翻修,自由刺入并达到精确的公差。在STLP船体之前,将多段式钢筋束安装到桩上,并使用临时浮力模块将其保持张紧状态。将TLP船体装上并干拖到标准货船上。用井架驳船将船体抬起并刺穿在预先安装的腱上。使用船体压载t和控制绞车系统实现了压载和腱锁定期间TLP的微调。使用的系统允许从建筑船上远程控制海鸥压载和腱张力监测系统。 Thje装置顶侧安装装置是常规的墨西哥湾集成式甲板升降机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号