首页> 外文会议>Annual offshore technology conference >Genesis Spar Hull and Mooring System: Porject execution
【24h】

Genesis Spar Hull and Mooring System: Porject execution

机译:Genesis Spar船体和系泊系统:项目执行

获取原文

摘要

This paper rpovides an overview of the porject execution phase for the genesis hull and mooring system, begining with project team scope, responsibilities, and organization. Safety, quality, cost and schedule are eviewed, with special attention given to the issue of safety, Selected technical challenges are discussed, including deck leg to hull connection, chain jack foundation, transportation, connector testing, riser guies, and strakes. Lessons learned are noted.
机译:本文从项目团队的范围,职责和组织入手,概述了创世纪船体和系泊系统的项目执行阶段。讨论了安全性,质量,成本和进度,并特别关注安全问题,讨论了一些技术难题,包括甲板腿到船体的连接,链条千斤顶的基础,运输,连接器测试,立管导轨和滑道。记下所学到的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号