首页> 外文会议>International conference and exhibition on Deep Offshore Technology >SUB SEA development and new challenges for operators on the norwegian continental shelf. where are we and where do we go?
【24h】

SUB SEA development and new challenges for operators on the norwegian continental shelf. where are we and where do we go?

机译:SUB SEA的发展以及挪威大陆架运营商面临的新挑战。我们在哪里,我们要去哪里?

获取原文

摘要

There has been a continuous development of subsea producton equipment, from simple diver assisted installations operated from enarby facilities to diverless retrievable modules operated from remote installations. The first subsea completion on the Norwegian continental shelf started up in 1971 at Ekofisk and remained on stream for some years. The great breakthrough for subsea production developments came 12 years later when North East Frigg came on stream with the first multi-well template. The latest development is the operation of diverless production systems producing to and controlled from dedicated floating vessels such as Njord, Asgard and Snorre B.See fig.2.
机译:从水下设施操作的简单的潜水员辅助设备到远程设施操作的无潜水员可回收模块,海底生产设备的开发一直在不断发展。挪威大陆架上的第一个海底完井工程始于1971年的Ekofisk,至今已有数年的历史。 12年后,东北弗里格(North East Frigg)推出了第一个多孔模板,这是海底生产发展的重大突破。最新发展是无潜水员生产系统的运作,该系统生产并由诸如Njord,Asgard和Snorre B等专用浮船控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号