首页> 外文会议>International conference on advances in steel structures;ICASS'99 >Long term analysis of externally prestressed composite beams
【24h】

Long term analysis of externally prestressed composite beams

机译:体外预应力组合梁的长期分析

获取原文

摘要

The time dependent behaviour of composite beams prestressed by external cables is analysed by assuming linear elastic behaviour for the steel and the interface shear connection,linear viscoelastic behaviour for the concrete and the hypothesis of frictionless cables.By assuming an admissible displacement field for the composite beam taking into account steel-concrete interface slipping,the balance condition is obtained by the virtual work principle.The solution is numerically achieved by introducing a suitable discretization of the time interval so that the viscoelastic problem reduces to a sequence of elastic problems,which are solved by the Ritz method.The results reported of some numerical analyses show that prestressing cables do not sensibly modify their stress in time.On the other hand,the stress state of the composite beam is strongly time-dependent due to non-homogeneity of the cross section.The stress distribution on the slab can however be optimised.
机译:通过假设钢和界面剪力连接的线性弹性行为,混凝土的线性粘弹性行为以及无摩擦缆索的假设,分析了由外部缆索预应力的复合梁的随时间变化的行为。考虑到钢-混凝土界面的滑移,通过虚拟的工作原理获得平衡条件。通过引入适当的时间间隔离散化解决方案,从而将粘弹性问题简化为一系列弹性问题,从而解决了该问题。一些数值分析的结果表明,预应力电缆不能及时地合理改变其应力。另一方面,由于交叉点的不均匀性,复合梁的应力状态与时间密切相关。然而,可以优化平板上的应力分布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号