首页> 外文会议>American power conference >Risk informed ist: out of the long tunnel of development and into the warm sunlight of implementation
【24h】

Risk informed ist: out of the long tunnel of development and into the warm sunlight of implementation

机译:风险告知专家:走出漫长的发展通道,进入实施的阳光

获取原文

摘要

The long tunnel of development started in 1993 with an initiative by the ASME O&M Committee to have a RI-ISI presentation.Committee members thought this was a great concept to use probabilistic risk assessment vice subjective risk assessment to decide what IST components were important.The long tunnel of development ended in 1998 with the issuance of the ASME OMN-3 Code Case,NRC Regulatory Guide 1.175,and the Comanche Peak SER for their RI-IST pilot application.
机译:漫长的发展之路始于1993年,由ASME O&M委员会倡议进行RI-ISI演示。委员会成员认为,使用概率风险评估和主观风险评估来决定IST的重要组成部分是一个很好的概念。 1998年,随着ASME OMN-3代码案例,NRC监管指南1.175以及Comanche Peak SER的RI-IST试点应用的发布,结束了漫长的开发隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号