This paper provides insights into the safety certification process on a rail transit system. It may be useful to other transit agencies or organizations that are planning, implementing or modifying their safety certification program. The safety certification process verifies and documents that a start-up rail transit project is safe to open to the riding public. It begins in design, and continues through construction, testing, and startup. In Los Angeles, the recent grand openings of the Metro Green Line and Metro Red Line Segment 2A were successfully safety certified by the Los Angeles County Metropolitan Transportation Authority (MTA). In both cases, early coordination with all involved agencies and individuals was a key to the success. (Two follow-on extensions to the Red Line are planned to open later this year and in the Year 2000.) Several entities are involved in the MTA rail projects. The General Engineering Consultant who designs the project, the Construction Manager who manages the construction, specialty consultants who provides input on their area of expertise, fire services who enforces code requirements, the Public Utilities Commission regulator who oversees safety, and MTA Construction and Operations staff who jointly works to open each project successfully. The sheer number of agencies and individuals involved necessitates early coordination of tasks and responsibilities. Several disciplines are reviewed for safety certification. As practiced on the Los Angeles MTA rail projects, the safety certification program covers several areas as discussed in the report: 1) Design 2) Construction 3) Integrated Testing 4) Contractual Training 5) Emergency Response Training Drills 6) Passenger Vehicle 7) Fire/Life Safety 8) Operations Several areas for improvement are identified as lessons learned. These lessons learned targets program implementation issues, based upon the experiences of four project openings. Among the subjects addressed in this report are: 1) Early definition of the safety certification program. 2) Use of an easily understandable, effective and agreeable program. 3) Dissemination of the program requirements to involved participants and nurture program support. 4) Solicit management support of the program. 5) Monitor the program and obtain feedback. 6) Modify the program as necessary to meet objectives. 7) Prepare for setbacks and potential work-arounds. 8) Identify absolute need dates for work. 9) Be flexible. The lessons learned from each grand opening present opportunities for refinement on future projects. In Los Angeles, safety certification is evolving into a more comprehensive and effective process based on these lessons learned. Information is discussed that may benefit other transit agencies facing upcoming rail start-ups.
机译:本文提供了对轨道交通系统安全认证过程的见解。这对于正在计划,实施或修改其安全认证计划的其他运输机构或组织可能很有用。安全认证过程会验证并记录启动铁路运输项目是否可以安全地向公众开放。它从设计开始,一直持续到构建,测试和启动。在洛杉矶,新近开通的地铁绿线和地铁红线2A段已成功通过了洛杉矶县城市交通管理局(MTA)的安全认证。在这两种情况下,尽早与所有相关机构和个人进行协调是成功的关键。 (红线的两个后续扩建计划于今年晚些时候和2000年开放。)MTA铁路项目涉及多个实体。设计项目的一般工程顾问,管理建筑的施工经理,提供专业知识的专业顾问,执行法规要求的消防,负责安全的公用事业委员会监管者以及MTA建设和运营人员他们共同努力成功地打开了每个项目。所涉机构和个人数量众多,因此必须尽早协调任务和责任。审查了几门学科以获得安全认证。根据洛杉矶MTA铁路项目的实践,安全认证计划涵盖报告中讨论的几个领域:1)设计2)施工3)综合测试4)合同培训5)应急培训6)乘用车7)消防/生命安全8)运营总结了几个需要改进的地方,作为汲取的教训。这些经验教训基于四个项目开幕式的经验,针对计划实施问题。本报告涉及的主题包括:1)安全认证计划的早期定义。 2)使用易于理解,有效且令人满意的程序。 3)向参与人员传播计划要求,并培养计划支持。 4)征求对该程序的管理支持。 5)监视程序并获取反馈。 6)根据需要修改程序以达到目标。 7)准备挫折和潜在的解决方法。 8)确定工作的绝对需要日期。 9)要灵活。从每个盛大开幕式中学到的经验教训为将来的项目改进提供了机会。在洛杉矶,基于这些经验教训,安全认证正在演变为更全面,更有效的过程。讨论的信息可能使其他即将面临铁路起步的运输机构受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号