首页> 外文会议>Structures congress >Improving Estimates of Earthquake-Induced Downtime in Individual Buildings Using the REDi Methodology
【24h】

Improving Estimates of Earthquake-Induced Downtime in Individual Buildings Using the REDi Methodology

机译:利用REDI方法改善各种建筑物中地震诱导的停机时间的估计

获取原文

摘要

Earthquake-induced loss of functionality and downtime in individual buildings can cause major economic and societal impacts, ranging from displacement of individual families and businesses to disruption of emergency medical services and government functions. The ability to predict recovery times for buildings after an earthquake is a critical component in understanding and mitigating the seismic risks facing a community. The seismic performance assessment methodology proposed by FEMA P-58 created a framework that translated structural performance into metrics that would enable stakeholders to make risk-informed decisions. Upon that framework, the REDi downtime assessment methodology was created to convert repair times from a FEMA P-58 assessment into building downtime through realistic labor allocation, consideration of delays to initiation of repairs, and calculation of intermediate goals along the path to full recovery. Since its initial development in 2013, the REDi downtime assessment methodology has been implemented in several projects. From these project and research applications, further improvements have been made to the previously published methodology. These improvements, key takeaways, and remaining challenges are discussed.
机译:地震诱导的个体建筑物的功能和停机时间可能导致主要的经济和社会影响,从个别家庭和企业对应急医疗服务和政府职能中断的影响范围。在地震后预测建筑物恢复时间的能力是理解和减轻社区面临的地震风险的关键组成部分。 FEMA P-58提出的地震性能评估方法创建了一个框架,它将结构性能转化为能够使利益相关者能够进行风险信息的决策。在该框架上,创建了重新停机评估方法,以通过现实的劳动力分配将维修时间转换为建立停机时间,审议延迟进行维修,以及沿着全面恢复的道路计算中间目标的计算。自2013年初步发展以来,已在几个项目中实施了Redi停机时间方法。从这些项目和研究应用程序来看,已经进一步改进了先前公布的方法。讨论了这些改进,关键的外卖和剩余挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号