【24h】

Mensa Project: Rig Operations

机译:Mensa项目:钻机作业

获取原文

摘要

Mensa's subsea completion operations were conducted from a moored semi-submersible in 5300 ft. water. The rig based completion operations represent a milestone in deepwater subsea completion operations technology. The paper will focus on unique subsea completion operations employed from the rig, completion mooring operations, and the completion interface issues encountered during the installation of the subsea system.
机译:Mensa的海底完井作业是在5300英尺的水中,从一艘停泊的半潜式潜水器进行的。基于钻机的完井作业代表了深水海底完井作业技术的里程碑。本文将重点介绍钻机所采用的独特的海底完井作业,完井系泊作业以及在海底系统安装过程中遇到的完井界面问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号