【24h】

Preliminary field testing of a servoactuated pantograph

机译:伺服受电弓的初步现场测试

获取原文

摘要

One of the main problems concerning high speed running on Italian railways is the current pick up. The contact force between the pantograph and the overhead contact line increases its amplitude and frequency as the speed increases. The frequent detachments generated by this situation cause not only the temporary interruption of power transmission and wire and contact shoe erosion and produce electromagnetic pollution. A frequent method to reduce detachments is based on the progressive increase of uplift force with the increasing speed. This solution can't be used in high speed running as the excessive contact force necessary to avoid detachments causes a very quick erosion of contact shoes. Furthermore, operating in the above mentioned conditon, the amplitude of contact shoe oscillations may cause impact with the suspension devices of overhead line. An alternative approach to solve these problems is the use of a servo actuated pantograph able to maintain the contact force at a given value. In order to obtain the above mentioned result a FS pantograph was modified applying a brushless servomotor connected by a wire to the contact strip. This actuator, adding its force to the effect of the traditional air bellow, is able to properly regulate the contact force. In the paper the preliminary experimental results, obtained by a special test rig in a FS laboratory, are reported and discussed.
机译:当前在意大利铁路上高速行驶的主要问题之一是高速行驶。受电弓与高架接触线之间的接触力随着速度的增加而增加其幅度和频率。这种情况下产生的频繁脱落不仅会导致电力传输,电线和接触靴的腐蚀暂时中断,还会产生电磁污染。减少脱离的一种常用方法是基于提升力随着速度的增加而逐渐增加。该解决方案不能用于高速运行,因为避免分离所必需的过大接触力会导致接触靴的快速腐蚀。此外,在上述条件下操作时,接触靴振动的幅度可能引起对架空线的悬挂装置的冲击。解决这些问题的另一种方法是使用能够将接触力保持在给定值的伺服受电弓。为了获得上述结果,通过将无刷伺服电机通过导线连接到接触带上,对FS受电弓进行了修改。该执行器将其力增加到传统空气波纹管的作用中,能够适当地调节接触力。在本文中,报告并讨论了通过FS实验室的特殊测试台获得的初步实验结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号