【24h】

Ad-hoc planning of timetables for accidents or maintenance sites

机译:临时计划事故或维修地点的时间表

获取原文

摘要

One of the biggest problems for railway operation is the manatgement of train runs druing accidents or maintenance sites on double-track-lines. The consequences of these events are barrings and speed restrictions on the main track which cause delays of the trains passing the location. Therefore it is necessary to construct a new timetable based on the existing timetable in consideration of influences of the hindrances on train runs to guarantee safety with high quality. For this purpose the interactive maintenance-site-timetable-cnstruction-system BAUPLAN is used. With a computer-aided construction system it is possible to research several variants of infrastructure (e.g.the usage of additional switches in the site area)and timetable operating strategies in only a part of the time needed today for the manual layout of train diagrams.
机译:铁路运营的最大问题之一是由于双轨线上的事故或维修现场而导致的列车运行管理。这些事件的后果是在主轨道上的限制和速度限制,这会导致列车通过该位置的延迟。因此,有必要在考虑到障碍物对列车行驶的影响的基础上,基于现有的时间表来构建新的时间表,以确保高质量的安全性。为此,使用了交互式维护站点时间表指令系统BAUPLAN。借助计算机辅助的施工系统,可以在如今手动配置火车图所需的一部分时间内,研究基础设施的多种变体(例如在站点区域中使用额外的开关)和时间表操作策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号