The Schkopau lighite-fired power plant, one of the most advanced power plants to be built, went online in 1996. The plant is fully automated and in particular new developments have been incorporated in the field of process control and control room design in particular, new approaches were ventured. This was the first case ever of process management exclusively with large wall disphlays and a hand-held mouse. The new concepts have been well accepted by the operating staff. This presentation will cover over two years of experience with this new kind of process management and visual display system.
展开▼