Moorburg Power STation of HEW. IT comprises two 515 MW steam turbosets. In the process of a planned modified operating regime, primary measures are to be carried out in the area of the boiler plant (low - NOx combustion). During overhaul work, both turbosets were inspected and it was necessary, to repair the casings of the HP parts. All these casings were sent to the Voest Alpine Steelworks for welding repairs. After completion of all repair work, both Units operated as peak load generation parts.
机译:HEW的Moorburg Power Station。 IT包括两个515 MW蒸汽涡轮机组。在计划的修改运行方案过程中,应在锅炉设备区域(低NOx燃烧)采取主要措施。在大修工作中,检查了两个涡轮机组,并且有必要修理HP零件的外壳。所有这些套管都被送到Voest Alpine钢厂进行焊接维修。在完成所有维修工作后,两个单元均作为峰值负载产生部件运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号